Air Compressors – 1 large building, 2 small dorms Bob Leavitt
Adams Hall – Painting – exterior trim, porches, and entries Bob Leavitt
Adams Hall – Flooring – 1st floor south end stairs Bob Leavitt
Adams – Paving/Landscaping – remove overgrown shrubs scattered along backside of building Bob Leavitt
Alumni Gym – Boilers – replace Teledyne with PVI Bob Leavitt
Alumni Gym – Ceilings – new ceiling tiles Bob Leavitt
Athletics – Baseball hitting facility Mike Gustin
31 Frye Street – Boiler replacement Bob Leavitt
Campus Avenue Project – Demolition and Utility Work, Complete Fall 2014 Chris Streifel
Carnegie Science – Painting exterior trim, Rooms 345, 411, 413, 414 Bob Leavitt
Carnegie Science – Flooring Carpet 345, 411, 413, first floor steps quad side Bob Leavitt
Carnegie Science – Controls replacement, Complete Spring 2015 J. Rasmussen
Chapel – Roofs – EPDM section Bob Leavitt
Chase Hall – Fit-up for OIE P. Farnsworth
Chase House – Paving/Landscaping – driveway Bob Leavitt
Cheney House – Paving/Landscaping – prune/thin plants in front of house Bob Leavitt
Cheney House – Fire Alarms – new panel and devices Bob Leavitt
Cheney House – Sprinkler Systems – new valve, internal, and 4 head check Bob Leavitt
Clason House – Painting – exterior Bob Leavitt
Clason House – Paving/Landscaping – remove overgrown shrubs & seed area on Turner House side Bob Leavitt
215 College Street – HR – Painting exterior Bob Leavitt
215 College Street – Garage roof – new asphalt Bob Leavitt
220 College Street – Payroll – replace all windows Bob Leavitt
Commons – Paving/landscaping – widen walkway adjacent to Central Avenue Bob Leavitt
Dana Chemistry – Painting exterior trim Bob Leavitt
Dana Chemistry – Chalkboard, projector, front bench, periodic table Mike Gustin
Dunn House – Painting exterior Bob Leavitt
Dunn House – Porches/Stairs – front/side porch Bob Leavitt
Frye St Union – 4th floor bathroom renovation Bob Leavitt
Gray Cage – Paving/Landscaping – diagonal walk towards Muskie Bob Leavitt
Gray Cage – Controls replacement J. Rasmussen
Hacker Garage – Roofs – new asphalt Bob Leavitt
Hathorn Hall – Paving/Landscaping – prune/thin azaleas in bed by magnolia tree Bob Leavitt
Hayes House – Paving/Landscaping – remove old shrubs and replant Bob Leavitt
Health Center – Connect existing FA panel to master box P. Farnsworth
Health Center – Fire Alarms – new panel and devices Bob Leavitt
Hedge Hall – Bike Rack quad side Bob Leavitt
Hedge Hall – Floor replacements P. Farnsworth
Hopkins Hall – Life Safety – obstructed head in 2nd floor Men’s Bob Leavitt
Hopkins Hall – Suite Lounge Furniture Replacement (July 29) D. Larrabee
John Bertram – Porches/Stairs – repair/replace main steps adjacent to parking area Bob Leavitt
Lake Andrews – Paving/Landscaping – prune/maintain plants around memorial benches Bob Leavitt
Lane Hall – Painting exterior touch-up/columns and bases Bob Leavitt
Lane Hall – Connect existing FA panel to master box P. Farnsworth
Libbey Forum – Connect existing FA panel to master box P. Farnsworth
Lindholm House – Roofs – new asphalt, small EPDM section Bob Leavitt
Merrill Gym – Ceilings – corridors, new tiles and lights (part of sprinkler job) Bob Leavitt
Merrill Gym – Dance wing fire sprinkler (Phase 2 of 2), Complete Fall 2014 Mike Gustin
Merrill Gym – Controls replacement, Complete Winter 2015 J. Rasmussen
Milliken House – Fire Alarms – new panel and devices Bob Leavitt
Mitchell House – Flooring – flooring in bathrooms Bob Leavitt
Muskie Archives – Replace all windows Bob Leavitt
Muskie Archives – Carpet Bob Leavitt
Muskie Archives – Roofs – copper/slate repairs Bob Leavitt
356 College Street – Boiler replacement Bob Leavitt
95 Nichols Street – Potential Pellet Boiler Install Bob Leavitt
141/145 Nichols Street – Bathroom Renovations Bob Leavitt
Olin Arts – Painting exterior trim and soffits, replace window seals and/or sash replacement Bob Leavitt
Olin Arts – A/V in Rms 130, 135, 136, 137 Mike Gustin
Olin Arts – Renovate bank planting between steps and building on Lake Andrews side Bob Leavitt
Olin Arts – 1st & 2nd floor bathroom upgrades Bob Leavitt
Page Hall – Painting College Street entry Bob Leavitt
Page Hall – Life Safety – fire sprinkler head coverage modifications Bob Leavitt
Parker Hall – Bike Rack Alumni Walk side Bob Leavitt
Parsons House – Sprinkler Systems – internal, and 4 head check Bob Leavitt
Pettengill Hall – Flooring – ground floor rear entry area Bob Leavitt
Pettengill Hall – Classroom Capture Rm G21, repaint walls Mike Gustin
Pettigrew Hall – Life Safety – life safety hardware for 10 doors, UL rating on all corridor doors to exit enclosure Bob Leavitt
Rand Hall – Windows Bob Leavitt
Roger Williams – Bike Rack Quad side Bob Leavitt
Roger Williams – Flooring replacements P. Farnsworth
Schaeffer Theatre – Carpeting Bob Leavitt
Small House – Paving/Landscaping – remove old shrubs and replant College Street side Bob Leavitt
Turner House – Paving/Landscaping – remove burning brush hedge and seed on College Street side Bob Leavitt
Vehicles – Trash Truck, Office Services van, Security SUV John Griffiths
52 Ware Street – Exterior Painting Bob Leavitt
Webb House – Flooring – flooring in bathrooms Bob Leavitt
Whittier House – Fire Alarms – new panel and devices Bob Leavitt