{"id":132015,"date":"2020-04-08T07:09:54","date_gmt":"2020-04-08T11:09:54","guid":{"rendered":"https:\/\/www.bates.edu\/news\/?p=132015"},"modified":"2026-02-18T22:56:43","modified_gmt":"2026-02-19T03:56:43","slug":"campus-construction-update-april-10-2020","status":"publish","type":"post","link":"https:\/\/www.bates.edu\/news\/2020\/04\/08\/campus-construction-update-april-10-2020\/","title":{"rendered":"Campus Construction Update: April 10, 2020"},"content":{"rendered":"\n<p>Gathered once again in the Peter J. Gomes Chapel are 20 historical figures who in the 1930s and \u201940s were regarded as leading lights of Western civilization.&nbsp;<\/p>\n\n\n\n<p>Pun intended: From Marie Curie all the way back to Homer, these artists, scientists, and theorists appear as stained-glass depictions that grace eight ornate windows in the side walls of the nave. As part of a <a href=\"https:\/\/www.bates.edu\/news\/2020\/01\/10\/campus-construction-update-jan-10-2020\/\">larger chapel project<\/a> that\u2019s still underway, seven of the eight were removed in 2018 for restoration. (Remaining in place were poet Dante Alighieri and painter Fra Angelico, which were restored previously.)<\/p>\n\n\n\n<p>And now they\u2019re back. The glass work was completed during the winter by Vintage Glass Works of Lisbon Falls, Maine. Jim Nutting \u201976, also known for his original creations with Maine Art Glass, rebuilt the stained-glass panels, which were installed by Matthew Kendall in conjunction with Consigli.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"900\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Gomes_Consigli_73133CA8-8BC0-42A6-9C5F-F7EFEB53F57C-600x900.jpg\" alt=\"This view of the Gomes Chapel's south facade shows staging that workers are using to get at the large decorative windows that will be restored this year. (Courtesy of Consigli Construction)\" class=\"wp-image-132038\" style=\"width:450px;height:675px\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Gomes_Consigli_73133CA8-8BC0-42A6-9C5F-F7EFEB53F57C-600x900.jpg 600w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Gomes_Consigli_73133CA8-8BC0-42A6-9C5F-F7EFEB53F57C-200x300.jpg 200w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Gomes_Consigli_73133CA8-8BC0-42A6-9C5F-F7EFEB53F57C-1024x1536.jpg 1024w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Gomes_Consigli_73133CA8-8BC0-42A6-9C5F-F7EFEB53F57C-133x200.jpg 133w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Gomes_Consigli_73133CA8-8BC0-42A6-9C5F-F7EFEB53F57C.jpg 1279w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">This view of the Gomes Chapel&#8217;s south facade shows staging that workers are using to get at the large decorative windows that will be restored this year. (Courtesy of Consigli Construction)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>It was strange to have those figures gone. Raymond Clothier, associate multifaith chaplain, missed the sheer aesthetics of the glass, he says.&nbsp;<\/p>\n\n\n\n<p>\u201cDuring difficult times in my years at Bates, I\u2019ve found solace by sitting in the chapel and watching the early morning light stream through the stained-glass windows,\u201d he says. \u201cThe richness of the color on the old wood makes the place feel alive to me, and I imagine all of the lives that have been touched by this place.\u201d<\/p>\n\n\n\n<p>In another, more-down-to-earth Gomes Chapel headline, the renovation will also equip the building with its first accessible restroom. An anteroom at the rear of the building on the College Street side, where the accessible chapel entrance is located, will be converted into the new comfort station.<\/p>\n\n\n\n<p>\u201cAdding an accessible bathroom to the historic chapel is not only absolutely necessary but is also an offering of compassion and hospitality,\u201d says Multifaith Chaplain Brittany Longsdorf. \u201cWhen we update various buildings on our campus and prioritize adding accessible elements, we\u2019re saying, \u2018All are welcome here.\u2019\u201d<\/p>\n\n\n\n<p>She says, \u201cGomes Chapel is used for several campus-wide and public-facing events \u2014 Orientation, Martin Luther King Jr. Day, memorials, Lessons and Carols, weddings, and Reunions. It\u2019s wonderful that the chapel can now be a more comfortable place for everybody and every <em>body<\/em>.\u201d<\/p>\n\n\n\n<p>Meanwhile, on the outside, the focus of the restoration has shifted to the building\u2019s end walls, facing Alumni Walk to the north and downtown Lewiston to the south, respectively. Both require repair or replacement of exterior masonry, as we saw during much of last year on the east and west walls \u2014 notably repointing mortar and attending to deteriorating cast stone.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"600\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Gomes_1746_dlh-900x600.jpg\" alt=\"With masonry repairs  complete on the east and west exterior walls of the Gomes Chapel, the emphasis has shifted to the north (shown) and south walls. (Doug Hubley\/Bates College)\" class=\"wp-image-132033\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Gomes_1746_dlh-900x600.jpg 900w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Gomes_1746_dlh-400x267.jpg 400w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Gomes_1746_dlh-1536x1024.jpg 1536w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Gomes_1746_dlh-200x133.jpg 200w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Gomes_1746_dlh.jpg 1919w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption class=\"wp-element-caption\">With masonry repairs  complete on the east and west exterior walls of the Gomes Chapel, the emphasis has shifted to the north (shown) and south walls. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Of course, the southern facade is the location of the building\u2019s elaborate main entrance, a portico that was partially rebuilt last year. What remains to be done? With the walls essentially complete, says Burgau, the concrete \u201clanding and stairs still need to be recast, and the roof installed.\u201d<\/p>\n\n\n\n<p>But those measures will come late in the project, following the removal, restoration, and reinstallation of the large, decorative south windows and their traceries \u2014 the ornate cast stone frames that retain and embellish the glass. With staging now conspicuously present, that window work has begun.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"900\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/Gomes_C6-edit-720x900.jpg\" alt=\"\" class=\"wp-image-132121\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/Gomes_C6-edit-720x900.jpg 720w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/Gomes_C6-edit-240x300.jpg 240w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/Gomes_C6-edit-1229x1536.jpg 1229w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/Gomes_C6-edit-160x200.jpg 160w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/Gomes_C6-edit.jpg 1535w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><figcaption class=\"wp-element-caption\">Back at home, a stained-glass tribute to the ancients: Philosopher Plato, center, is flanked by Greek artist Phidias (left) and mathematician Euclid. (Courtesy of Consigli Construction)<\/figcaption><\/figure>\n\n\n\n<p>The north window, a large and finely detailed depiction of Christ as the Lamb of God and disciples Matthew, Mark, Luke, and John, will come out next.<\/p>\n\n\n\n<p><strong>Keep your distance<\/strong>: In the era of COVID-19, Campus Construction Update has taken social distancing to heart. While 6 feet is the recommended gap between oneself and other humans, we are exercising an abundance of caution and staying 34 miles away from campus. The powerful telephoto lens on our camera (plus the photographic generosity of people at the scene) enables us to continue CCU coverage.<\/p>\n\n\n\n<p>But how is Consigli Construction, which is managing the restoration of Gomes Chapel and the building of the Bonney Science Center for Bates, balancing the demands of good health with construction deadlines? (<a href=\"https:\/\/www.maine.gov\/governor\/mills\/news\/governor-mills-takes-further-steps-respond-covid-19-protect-health-and-safety-maine-people\">Construction is considered an essential activity under Maine state COVID-19 guidelines<\/a>.)<\/p>\n\n\n\n<p>According to Nate Berry, the firm\u2019s assistant project manager for the Gomes project, the company has provided additional facilities for workers to wash and sanitize their hands, and is promoting the wearing of masks and gloves, as well as staying 6 feet apart when tasks permit. And daily \u201ctoolbox talk\u201d briefings help keep everyone on site cognizant of these precautions.<\/p>\n\n\n\n<div class=\"wp-block-bates-slideshow2-slideshow swiper-effect-slide is-style-boxed-in\"><div class=\"slideshow-toolbar\"><a href=\"#\" class=\"js-open-fullscreen fullscreen-button\" title=\"View full screen\"><\/a><\/div><div id=\"gallery3043\" class=\"swiper swiper-main has-captions has-autoheight\"><div class=\"swiper-button-next\"><\/div><div class=\"swiper-button-prev\"><\/div><div class=\"swiper-pagination\"><\/div><div class=\"swiper-wrapper\"><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Final preparations are underway just before concrete flows to complete the third-story floor slab at the Bonney building. (Jacob Kendall\/Bates College)\" data-id=\"132035\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Bonney_4320_jk.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Bonney_4320_jk-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Bonney_4320_jk-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Final preparations are underway just before concrete flows to complete the third-story floor slab at the Bonney building. (Jacob Kendall\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Concrete workers use riding trowels to smooth and condition freshly placed concrete on the third floor of the Bonney Science Center. (Jacob Kendall\/Bates College)\" data-id=\"132037\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Bonney_Power-Trowels_0001_jk.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Bonney_Power-Trowels_0001_jk-600x900.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200406_CCU_Bonney_Power-Trowels_0001_jk-600x900.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Concrete workers use riding trowels to smooth and condition freshly placed concrete on the third floor of the Bonney Science Center. (Jacob Kendall\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"One of three air handlers shoehorned into the Bonney Science Center basement on April 3. Two are this size and the third, which will serve only the vivarium in the basement, is smaller. (Geoffrey Swift\/Bates College)\" data-id=\"132034\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200403_CCU_Bonney_7387_gs.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200403_CCU_Bonney_7387_gs-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200403_CCU_Bonney_7387_gs-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>One of three air handlers shoehorned into the Bonney Science Center basement on April 3. Two are this size and the third, which will serve only the vivarium in the basement, is smaller. (Geoffrey Swift\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Now and then: A rendering of the Bonney Science Center is dwarfed by the building itself, seen from the intersection of Campus Avenue and, at right, Nichols Street. (Doug Hubley\/Bates College)\" data-id=\"132028\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1717_dlh.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1717_dlh-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1717_dlh-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Now and then: A rendering of the Bonney Science Center is dwarfed by the building itself, seen from the intersection of Campus Avenue and, at right, Nichols Street. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"A Lull-style forklift totes a section of Symons wall form down Bardwell Street toward the Bonney Science Center service area. (Doug Hubley\/Bates College)\" data-id=\"132024\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1701_dlh.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1701_dlh-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1701_dlh-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>A Lull-style forklift totes a section of Symons wall form down Bardwell Street toward the Bonney Science Center service area. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Seen from Nichols Street on March 25, Symons concrete forms are appearing for the west and  south third-story walls of the Bonney Science Center. (Doug Hubley\/Bates College)\" data-id=\"132020\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1678_dlh.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1678_dlh-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1678_dlh-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Seen from Nichols Street on March 25, Symons concrete forms are appearing for the west and  south third-story walls of the Bonney Science Center. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Concrete curing blankets are stored in readiness for use on the third-story walls of the Bonney Science Center. (Doug Hubley\/Bates College)\" data-id=\"132021\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1682_dlh.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1682_dlh-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1682_dlh-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Concrete curing blankets are stored in readiness for use on the third-story walls of the Bonney Science Center. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Structural steel and a few concrete wall forms are shown in this northeast view of the science center taken March 25, 2020. (Doug Hubley\/Bates College)\" data-id=\"132023\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1699_dlh.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1699_dlh-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200325_CCU_Bonney_1699_dlh-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Structural steel and a few concrete wall forms are shown in this northeast view of the science center taken March 25, 2020. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"And here's roughly the equivalent view roughly a year earlier, in early March 2019.  (Doug Hubley\/Bates College)\" data-id=\"122609\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2019\/03\/190306_CCU_SciBldg_6178_dlh-1.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2019\/03\/190306_CCU_SciBldg_6178_dlh-1-900x600.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2019\/03\/190306_CCU_SciBldg_6178_dlh-1-900x600.jpg\" loading=\"lazy\"\/><div class=\"image_caption\"><p>And here&#8217;s roughly the equivalent view roughly a year earlier, in early March 2019.  (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<p><strong>Floor it<\/strong>: Across the Historic Quad at the Bonney Science Center site, the winter-long accretion of steel and concrete into walls and floors is reaching a crescendo.<\/p>\n\n\n\n<p>The concrete pumper, with its long and weirdly extensible arm, has been placing sections of the third-story wall last week and this week, and on Monday last, it finished off the third-story floor slab.&nbsp;<\/p>\n\n\n\n<p>Once the wall around the building&#8217;s western half has firmed up and the Symons wall forms are peeled off, the steel erectors working for Precision Steel of Sainte-Marie, Quebec, will return to start hanging floor joists for the Bonney penthouse. That could be as soon as April 20.<\/p>\n\n\n\n<p>And by the next time we report to you, likely on May 8, installation of the penthouse floor decking should be in progress, says Chris Streifel, Facility Services project manager for the Bonney Science Center. \u201cThe third-floor walls should be close to complete, if not complete, and the penthouse slabs are going to be either partly done or on the near horizon.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"600\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200323_Bonney_concrete_4506-hjb-900x600.jpg\" alt=\"The pumper places concrete for a section of third-story wall on the Bonney center's south face on March 23. (Jay Burns\/Bates College)\" class=\"wp-image-132098\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200323_Bonney_concrete_4506-hjb-900x600.jpg 900w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200323_Bonney_concrete_4506-hjb-400x267.jpg 400w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200323_Bonney_concrete_4506-hjb-1536x1024.jpg 1536w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200323_Bonney_concrete_4506-hjb.jpg 1919w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption class=\"wp-element-caption\">With a pale sun overhead, the pumper places concrete for a section of third-story wall on the Bonney center&#8217;s south face on March 23. (Jay Burns\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>The Bonney building penthouse is a partial fourth story that will contain mechanical equipment and other building services.<\/p>\n\n\n\n<p>Speaking of mechanical equipment, but shifting from penthouse to basement, we were too socially distant last week to observe the delicate job of lowering two bus-sized air handlers, plus a smaller third unit, into Bonney&#8217;s cellar. That job relied on the crane and rigging expertise of Cote Corporation, based in Auburn, Maine.<\/p>\n\n\n\n<p>Access to the basement for big heavy stuff is through the so-called areaway, which will ultimately serve as the science center&#8217;s air intake. Located at the back of the building, it&#8217;s a long, deep, and narrow concrete shaft that opens into the basement at a right angle. Maneuvering an expensive bus-like object down and around and in must have resembled building a ship in a bottle. It&#8217;s something we&#8217;d love to have seen.<\/p>\n\n\n\n<p>The two bigger units \u201cwere a very, very close fit, which was expected,\u201d says Streifel. \u201cIt&#8217;s nice that it worked out just the way that it was planned to.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"600\" src=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1712_dlh-2-900x600.jpg\" alt=\"\" class=\"wp-image-132115\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1712_dlh-2-900x600.jpg 900w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1712_dlh-2-400x267.jpg 400w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1712_dlh-2-1536x1024.jpg 1536w, https:\/\/www.bates.edu\/news\/files\/2020\/04\/200401_CCU_Bonney_1712_dlh-2.jpg 1919w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption class=\"wp-element-caption\">Seen from Nichols Street on April 1, concrete forms are in place for the west and part of the south third-story walls of the Bonney Science Center. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>The air handlers joined a couple of laboratory-grade water treatment systems, one for purification and another for pH adjustment, necessitated by the Bonney center&#8217;s mission as a science center (a mission that also demands the high-capacity air handling plant, as interior air will be continuously refreshed.)<\/p>\n\n\n\n<p>\u201cThat wraps up the majority of the big equipment for the basement,\u201d with an additional filtration system on the way, says Streifel. \u201cNow that the big pieces of equipment are there, they can set those up and then start running everything to them.<\/p>\n\n\n\n<p>\u201cThere&#8217;s still a tremendous amount of the infrastructure to go in, all the ductwork and piping. There are some massive ducts that have to be connected to those massive air handlers,\u201d in a dense and complex arrangement of ducts overlaid on ducts (which somehow puts us in mind of waterfowl on the spring-green banks of Lake Andrews).<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>\u201cMore and more ductwork, electrical, piping moving ever higher.\u201d<\/p>\n<\/blockquote>\n\n\n\n<p>Up on the first floor, walls are being framed out and rough-ins for utilities \u2014 the pros call them &#8220;MEP,&#8221; for mechanical, electrical, and plumbing \u2014 are being installed. Soon those activities will expand to the second floor, where wall layouts are already being marked out.&nbsp;<\/p>\n\n\n\n<p>\u201cNow that the third-floor deck is in place, the inside can be buttoned up and sealed in so they can do more work on the second floor, more work on the first floor,\u201d Streifel says. \u201cIt&#8217;ll just be more and more of everything inside \u2014 more and more ductwork, electrical, piping moving ever higher.\u201d<\/p>\n\n\n\n<p>Finally, while COVID-19 curtailments on rambling around have drained the urgency from traffic reports, we&#8217;ll stick to CCU tradition (take comfort where you find it, yes?) and let you know about a few street closures near the Bonney site. Nichols Street will be closed part of next week for the implanting of underground data conduits, and electrical work will shut down Bardwell Street during the week of the 20th.&nbsp;<\/p>\n\n\n\n<p><strong>Can we talk<\/strong>? Campus Construction Update welcomes your  questions and comments about current, past, future, and current  construction at Bates. Write to <a rel=\"noreferrer noopener\" href=\"mailto:dhubley@bates.edu\" target=\"_blank\">dhubley@bates.edu<\/a>, putting \u201cCampus Construction\u201d or \u201cSocial distancing is no hardship for you, is it, Campus Construction Update?\u201d in the subject line.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Gomes Chapel restoration passes a milestone with the return of stained-glass images depicting major figures in Western civilization. <\/p>\n","protected":false},"author":105,"featured_media":132211,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_hide_ai_chatbot":false,"_ai_chatbot_style":"","associated_faculty":[],"_Page_Specific_Css":"","_bates_restrict_mod":false,"_table_of_contents_display":false,"_table_of_contents_location":"","_table_of_contents_disableSticky":false,"_is_featured":false,"footnotes":"","_bates_seo_meta_description":"","_bates_seo_block_robots":false,"_bates_seo_sharing_image_id":0,"_bates_seo_sharing_image_twitter_id":0,"_bates_seo_share_title":"","_bates_seo_canonical_overwrite":"","_bates_seo_twitter_template":""},"categories":[223,11009],"tags":[11942,1932,12135,1312],"class_list":["post-132015","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-slideshow","category-the-college","tag-bonney-science-center","tag-campus-construction-updates","tag-covid-19","tag-gomes-chapel"],"_links":{"self":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/132015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/users\/105"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/comments?post=132015"}],"version-history":[{"count":23,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/132015\/revisions"}],"predecessor-version":[{"id":172018,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/132015\/revisions\/172018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media\/132211"}],"wp:attachment":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media?parent=132015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/categories?post=132015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/tags?post=132015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}