{"id":142566,"date":"2021-11-03T08:28:21","date_gmt":"2021-11-03T12:28:21","guid":{"rendered":"https:\/\/www.bates.edu\/news\/?p=142566"},"modified":"2026-02-19T09:31:59","modified_gmt":"2026-02-19T14:31:59","slug":"campus-construction-update-nov-4-2021","status":"publish","type":"post","link":"https:\/\/www.bates.edu\/news\/2021\/11\/03\/campus-construction-update-nov-4-2021\/","title":{"rendered":"Campus Construction Update: Nov. 4, 2021"},"content":{"rendered":"\n<p>Waxing all poetic in late September, Campus Construction Update noted that \u201cthe slow pivot from destruction to construction is beginning\u201d in the renovation of Dana Chemistry Hall.<\/p>\n\n\n\n<p>Well, pivot completed! A little more than a month after <a href=\"https:\/\/www.bates.edu\/news\/2021\/09\/29\/campus-construction-update-sept-30-2021\/\">that post<\/a>, the dust, disorder, and debris of demolition are just fodder for nostalgia, and new walls are rising inside the 56-year-old building that, when renovations are done next summer, will be known simply as Dana Hall.<\/p>\n\n\n\n<p>The demolition that figured so prominently early on in the project was complete by the second week of October. Also finished is the abatement of hazardous materials.&nbsp;<\/p>\n\n\n\n<p>Now the project team is devoting all its attention to constructive ends: prepping floors for their final surfaces, which we won\u2019t see for months; erecting partition walls; roughing in myriad utility connections; and commencing the installation of machinery, primarily HVAC, in the building\u2019s fourth-floor attic.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-bates-slideshow2-slideshow swiper-effect-slide is-style-boxed-in\"><div class=\"slideshow-toolbar\"><a href=\"#\" class=\"js-open-fullscreen fullscreen-button\" title=\"View full screen\"><\/a><\/div><div id=\"gallery9947\" class=\"swiper swiper-main has-captions has-autoheight\"><div class=\"swiper-button-next\"><\/div><div class=\"swiper-button-prev\"><\/div><div class=\"swiper-pagination\"><\/div><div class=\"swiper-wrapper\"><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"&quot;RD&quot; stands for Roland's Drywall Inc., the local firm building new partition walls in Dana. This sunlit scene is a second-floor classroom. (Doug Hubley\/Bates College)\" data-id=\"142548\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3739_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3739_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3739_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>&#8220;RD&#8221; stands for Roland&#8217;s Drywall Inc., the local firm building new partition walls in Dana. This sunlit scene is a second-floor classroom. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Literally and figuratively, Lakeside Concrete Cutting of Newport, Maine, has done much of the heavy lifting early in the Dana renovation. The firm demolished all the masonry walls rendered superfluous by the building redesign, and continues to remove or reconfigure concrete for utility runs, etc. (Doug Hubley\/Bates College)\" data-id=\"142544\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3723_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3723_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3723_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Literally and figuratively, Lakeside Concrete Cutting of Newport, Maine, has done much of the heavy lifting early in the Dana renovation. The firm demolished all the masonry walls rendered superfluous by the building redesign, and continues to remove or reconfigure concrete for utility runs, etc. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Much of the early work on the Dana Chemistry Hall project involved masonry demolition. This third-floor image shows where concrete blocks were removed to widen a doorway. (Doug Hubley\/Bates College)\" data-id=\"142549\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3749_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3749_dlh-600x900.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3749_dlh-600x900.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Much of the early work on the Dana Chemistry Hall project involved masonry demolition. This third-floor image shows where concrete blocks were removed to widen a doorway. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Staff from Consigli Construction, the firm managing the Dana renovation for Bates, assess progress in a third-floor space that will be divided into two biology classrooms. The wall remnant at left is part of a shaft or &quot;chase&quot; containing utility connections. (Doug Hubley\/Bates College)\" data-id=\"142550\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3751_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3751_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3751_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Staff from Consigli Construction, the firm managing the Dana renovation for Bates, assess progress in a third-floor space that will be divided into two biology classrooms. The wall remnant at left is part of a shaft or &#8220;chase&#8221; containing utility connections. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"An array of new utility connections in the basement, with holes cut in the concrete for many more. The new pipes include black ones for wastewater or storm runoff; copper for domestic water; and blue for used chemical collection. (Doug Hubley\/Bates College)\" data-id=\"142558\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3787_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3787_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3787_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>An array of new utility connections in the basement, with holes cut in the concrete for many more. The new pipes include black ones for wastewater or storm runoff; copper for domestic water; and blue for used chemical collection. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Under construction is a wall forming two active-learning classrooms on Dana's second floor. Note the new exhaust duct and electrical conduits along the ceiling. (Doug Hubley\/Bates College)\" data-id=\"142546\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3731_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3731_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3731_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Under construction is a wall forming two active-learning classrooms on Dana&#8217;s second floor. Note the new exhaust duct and electrical conduits along the ceiling. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"A telescoping-boom forklift removes scrap steel from the Dana worksite. (Doug Hubley\/Bates College)\" data-id=\"142559\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3791_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3791_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3791_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>A telescoping-boom forklift removes scrap steel from the Dana worksite. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"In a visual echo of the Bonney Science Center aesthetic, windows or glass walls will afford transparency to student lounges in Dana Hall. This third-floor image shows the future site of one such lounge, slightly left of center. The photograph was taken in another. (Doug Hubley\/Bates College)\" data-id=\"142551\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3754_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3754_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3754_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>In a visual echo of the Bonney Science Center aesthetic, windows or glass walls will afford transparency to student lounges in Dana Hall. This third-floor image shows the future site of one such lounge, slightly left of center. The photographer was standing in another lounge site at the opposite end of the building. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Shown at center is a new electrical box in Dana's basement. (Doug Hubley\/Bates College)\" data-id=\"142557\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3786_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3786_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3786_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Shown at center is a new electrical box in Dana&#8217;s basement. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"This hallway provides a sense of the &quot;old Dana&quot; and its confined spaces. Offices will be created along the right side and an administrative room at left. (Doug Hubley\/Bates College)\" data-id=\"142555\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3781_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3781_dlh-600x900.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3781_dlh-600x900.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>This first-floor hallway provides a sense of the &#8220;old Dana&#8221; and its confined spaces. Offices will be created along the right side and an administrative room at left. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<p>The crane and rigging experts from Cote Corporation of Auburn, Maine, will return to campus for that last category, likely around the end of the month. \u201cIt&#8217;s a pretty big operation,\u201d says Chris Streifel, Bates project manager for Dana. While the attic will accommodate a variety of machines related to temperature and humidity in the building, the dominant unit will be an air handler so big that it will be loaded in piecemeal.<\/p>\n\n\n\n<p>The largest component will contain an intriguing gizmo called an <a id=\"enthalpywheel\">enthalpy wheel<\/a> or energy recovery wheel. Both exhaust air from the building and fresh air from the outdoors pass through the wheel as it spins, and the wheel contains substances that capture heat energy and moisture and transfer them between the airflows.<\/p>\n\n\n\n<p>Such transfers reduce the treatment required for incoming air, thereby lightening the HVAC system\u2019s workload. (As with the Bonney Science Center, the air in Dana will be continuously replaced.) So in summer, the wheel cools and dries incoming air, transferring heat and moisture to the exhaust. In winter, it applies heat and moisture from the exhaust to cold, dry incoming air.<\/p>\n\n\n\n<p>Pretty neat.<\/p>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh.webp\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh.webp\" alt=\"In a month or so, Cote Crane will be loading a new air handler through this opening into the Dana Hall attic. (Doug Hubley\/Bates College)\" class=\"wp-image-142543\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3719_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><\/a><figcaption class=\"wp-element-caption\">Wheel of enthalpy: In a month or so, Cote Crane will be loading a new air handler through this opening into Dana&#8217;s attic. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>To get the air handler into the building, an existing opening (once and future site of a ventilation louver) that faces Hedge Hall will be embiggened. Yet, Streifel notes, \u201cit\u2019s going to be a very tight fit, even then.\u201d<\/p>\n\n\n\n<p>With that operation still weeks away, other chores in the attic are moving apace. Several parallel ribs in the new concrete floor will support the big HVAC unit. The old stainless steel exhaust stacks \u2014 a signature feature of the building\u2019s earlier profile \u2014 have been removed. And much new wallboard has been hung, again dividing up a space that for a few weeks would have made a great dance hall.<\/p>\n\n\n\n<p>What about the building\u2019s three public levels? The floor prep is nearly done throughout the building, says Streifel. That prep, as we\u2019ve reported previously, culminates in the placement of a cementitious self-leveling compound in a layer about half an inch thick.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh.webp\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"900\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh-600x900.webp\" alt=\"The metal wall studs on the second level of Dana indicate where new restrooms will be placed relative to the elevator on all three floors. ADA-compatible restrooms will be built to the left of the elevator. (Doug Hubley\/Bates College)\" class=\"wp-image-142547\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh-600x900.webp 600w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh-200x300.webp 200w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh-1024x1536.webp 1024w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh-133x200.webp 133w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3732_dlh.webp 1279w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">These metal wall studs on the second level of Dana indicate where new restrooms will be placed relative to the elevator on all three floors. ADA-compatible restrooms will be built to the left of the elevator. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Preparation for the preparation, if you will, consists of grinding the old concrete slab more or less smooth, and sealing it with an epoxy mixture. (Some spots, such as former restroom locations and other concentrations of plumbing, have holes right through the old slab that have needed filling.)<\/p>\n\n\n\n<p>In terms of all procedures, the second floor \u2014 that\u2019s where you enter from the Historic Quad \u2014 is the furthest along. So there, for instance, most wall studs are in place, affording an outline of the completed layout.&nbsp;<\/p>\n\n\n\n<p>The third floor was the last to undergo demolition, so is bringing up the rear. And the first-floor footprint is about a third larger than the second and third, thanks to the single-story section adjacent to Alumni Walk, so there\u2019s been more to do.<\/p>\n\n\n\n<p>Throughout Dana, mechanical-electrical-plumbing work is going strong. \u201cThey\u2019re hanging stuff all over the place,\u201d Streifel says. \u201cDuctwork, electrical conduits, piping, fire protection \u2014 all of that is underway, particularly in the basement and first floors, but all floors, really.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh.webp\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh.webp\" alt=\"Mechanical room with a view: This view northeast from Dana Hall\u2019s attic was taken on Nov. 1 through a hole in the gable that is a former and future air intake for the HVAC system. The tent was set up for Back to Bates festivities. (Doug Hubley\/Bates College)\" class=\"wp-image-142552\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3760_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><\/a><figcaption class=\"wp-element-caption\">Mechanical room with a view: This view northeast from Dana Chem\u2019s attic was taken on Nov. 1 through a hole in the gable that is a former and future air intake for the HVAC system. In place throughout the fall, the tent has provided shelter for various events held outside as part of Bates\u2019 COVID-19 precautions. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>Looking ahead, he adds, \u201cwe\u2019re going to go from starting walls to talking about finishes in a few months. By March and April, we&#8217;ll be talking about turning systems on, as opposed to a couple years,\u201d as was the case with the much bigger, built-from-scratch Bonney Science Center.&nbsp;<\/p>\n\n\n\n<p>\u201cI would expect that we&#8217;ll be going through punch-listing and commissioning in June and July. There&#8217;s a little bit of time in July to tidy things up, finish up punch-listing, and get new furniture in. We\u2019ll move in during August \u2014 relatively speaking, a much easier move than what we just went through\u201d with Bonney. (Not least because so much stuff was moved from Dana to Bonney.)<\/p>\n\n\n\n<p><strong>Can we talk?<\/strong> Campus Construction Update loves to hear from you. Please send your questions, comments, and reminiscences about construction at Bates College to <a href=\"mailto:dhubley@bates.edu\" target=\"_blank\" rel=\"noreferrer noopener\"><em>dhubley@bates.edu<\/em><\/a>, with \u201cCampus Construction\u201d or \u201cWould more personal enthalpy make me more popular?\u201d in the subject line.<\/p>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh.webp\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh.webp\" alt=\"Dana Hall\u2019s main entrance lobby. Note the steel decking right of center \u2014 the former site of restrooms, the steel will be infilled with concrete. The new restrooms are under construction out of the frame to the right. (Doug Hubley\/Bates College)\" class=\"wp-image-142545\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2021\/11\/211104_CCU_Dana_3726_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><\/a><figcaption class=\"wp-element-caption\">Dana\u2019s main entrance lobby. Note the steel decking right of center \u2014 filling a gap left by the removal of plumbing from former restrooms, the steel will be topped with concrete. New restrooms are under construction out of the frame to the right. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During the past few weeks, the focus of the Dana Chem project has shifted from removal to renewal.<\/p>\n","protected":false},"author":105,"featured_media":142567,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_hide_ai_chatbot":false,"_ai_chatbot_style":"","associated_faculty":[],"_Page_Specific_Css":"","_bates_restrict_mod":false,"_table_of_contents_display":false,"_table_of_contents_location":"","_table_of_contents_disableSticky":false,"_is_featured":false,"footnotes":"","_bates_seo_meta_description":"","_bates_seo_block_robots":false,"_bates_seo_sharing_image_id":0,"_bates_seo_sharing_image_twitter_id":0,"_bates_seo_share_title":"","_bates_seo_canonical_overwrite":"","_bates_seo_twitter_template":""},"categories":[11009],"tags":[1932,12269,7765],"class_list":["post-142566","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-the-college","tag-campus-construction-updates","tag-dana-hall","tag-science-education"],"_links":{"self":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/142566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/users\/105"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/comments?post=142566"}],"version-history":[{"count":20,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/142566\/revisions"}],"predecessor-version":[{"id":172038,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/142566\/revisions\/172038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media\/142567"}],"wp:attachment":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media?parent=142566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/categories?post=142566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/tags?post=142566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}