{"id":164822,"date":"2024-08-26T12:30:02","date_gmt":"2024-08-26T16:30:02","guid":{"rendered":"https:\/\/www.bates.edu\/news\/?p=164822"},"modified":"2024-09-19T10:24:48","modified_gmt":"2024-09-19T14:24:48","slug":"campus-construction-update-aug-30-2024","status":"publish","type":"post","link":"https:\/\/www.bates.edu\/news\/2024\/08\/26\/campus-construction-update-aug-30-2024\/","title":{"rendered":"Campus Construction Update: Aug. 30, 2024"},"content":{"rendered":"\n<p>Since Aug. 19, Bates students have been sleeping, socializing, and preparing for the new year in the college\u2019s newest campus residence, now open for business following a renovation that began last December.<\/p>\n\n\n\n<p>With fresh paint, stylish furniture, and a striking new lounge, 96 Campus Avenue has welcomed a handful of early arrivals, including student Residence Life staff, leaders of forthcoming AESOP trips for first-year students, and athletes starting their practices.<\/p>\n\n\n\n<p>With the influx of the full student body this weekend, 57 of the building\u2019s 65 student beds will be filled. (A residence director also moved in last week.)<\/p>\n\n\n\n<p>Following a period of years during which 96 Campus Avenue housed a day care and offices, the renovation has returned the three-story brick building to its residential roots. It was constructed in 1977 to house nuns of the <a href=\"https:\/\/www.bates.edu\/news\/2024\/02\/28\/campus-construction-update-feb-28-2024\/\">Society of the Sisters of Charity,<\/a> who worked at the facility nearby that is now known as St. Mary\u2019s Health System.<\/p>\n\n\n\n<p>Bates bought the building in 2021 and decided just 11 months ago to convert it into a dorm.<\/p>\n\n\n\n<div class=\"wp-block-bates-slideshow2-slideshow swiper-effect-slide is-style-default\"><div class=\"slideshow-toolbar\"><a href=\"#\" class=\"js-open-fullscreen fullscreen-button\" title=\"View full screen\"><\/a><\/div><div id=\"slideshow3130\" class=\"swiper swiper-main has-captions has-autoheight has-pagination-progressbar\"><div class=\"swiper-button-next\"><\/div><div class=\"swiper-button-prev\"><\/div><div class=\"swiper-pagination\"><\/div><div class=\"swiper-wrapper\"><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Bates\u2019 newest student residence, seen from Campus Ave. (Doug Hubley\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164810\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4892_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4892_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4892_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Bates\u2019 newest student residence, seen from Campus Ave. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Having moved out of their office area at 96 Campus Avenue as the building\u2019s makeover neared its end, Consigli Construction staff hold a meeting in the building\u2019s new main lobby \u2014 formerly a truck bay. (Doug Hubley\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164800\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1859_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1859_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1859_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Having moved out of their office area at 96 Campus Avenue as the building\u2019s makeover neared its end, Consigli Construction staff hold a meeting in the building\u2019s new main lobby \u2014 formerly a truck bay. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"96 Campus Avenue awaited its inhabitants on Aug., 21, 2024. (Doug Hubley\/Bates College)\" height=\"900\" width=\"600\" data-id=\"164801\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1863_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1863_dlh-600x900.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1863_dlh-600x900.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>96 Campus Avenue awaits its inhabitants on Aug. 21, 2024. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"A few students had aleady moved into 96 Campus Avenue when we visited on Aug. 21. (Doug Hubley\/Bates College)\" height=\"900\" width=\"600\" data-id=\"164804\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1880_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1880_dlh-600x900.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1880_dlh-600x900.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>A few students had already moved into 96 Campus Avenue when we visited on Aug. 21. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Student rooms at 96 Campus Avenue are ready for their occupants. This first-floor room faces east. (Doug Hubley\/Bates College)\" height=\"900\" width=\"600\" data-id=\"164809\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1904_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1904_dlh-600x900.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1904_dlh-600x900.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Student rooms at 96 Campus Avenue are ready for their occupants. This first-floor room faces east. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"The bed, chests of drawers, a desk, and a chair in a single room at 96 Campus Avenue. (Doug Hubley\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164807\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1899_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1899_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1899_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>The bed, chests of drawers, a desk, and a chair in a single room at 96 Campus Avenue. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Shown on the deck at 96 Campus Avenue are new picnic tables and Adirondack chairs that have supplemented the weathered tables that came with the building. (Doug Hubley\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164813\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4907_dlh.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4907_dlh-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4907_dlh-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Shown on the deck at 96 Campus Avenue are new picnic tables and Adirondack chairs that have supplemented the tables, at rear, that came with the building. (Doug Hubley\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<p>\u201cI feel good about the project \u2014 I mean, it was a great transformation,\u201d Brian Lanoie, the Facility Services project manager in charge of the makeover, told us during an Aug. 21 tour. \u201cIt was extremely helpful that it was designed as a dormitory.&nbsp;<\/p>\n\n\n\n<p>\u201cAnd we had a great team,\u201d in project designers Lavallee | Brensinger Architects and construction management firm Consigli Construction. \u201cWe had the typical hiccups that you would expect, but we overcame those, and obviously we\u2019re open on time.<\/p>\n\n\n\n<p>\u201cSo overall, for the incredibly short timeframe we had, I&#8217;m very happy with the project.\u201d<\/p>\n\n\n\n<p>The city of Lewiston certified the building as fit for occupancy on Aug. 9, and on that same day Consigli returned control of the building to Bates as the two parties agreed that the project was, in the formal term, substantially complete. Still, minor chores remained, Lanoie explained during our tour.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"900\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1882_dlh-1-600x900.webp\" alt=\"A third-floor mini-lounge at 96 Campus Avenue. (Doug Hubley\/Bates College)\" class=\"wp-image-164827\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1882_dlh-1-600x900.webp 600w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1882_dlh-1-200x300.webp 200w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1882_dlh-1-419x628.jpg 419w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1882_dlh-1-1024x1536.webp 1024w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1882_dlh-1.webp 1279w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">A third-floor mini-lounge at 96 Campus Avenue. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Most could be categorized as punch-list items \u2014 minor problems revealed during final inspections. Those included a \u201clittle bit of everything,\u201d Lanoie said. For instance, back-ordered items awaiting installation: a unit heater, a few light fixtures, some door hardware.<\/p>\n\n\n\n<p>Plus \u201ca lot of touch-up painting. There\u2019s woodwork that needs to be fixed or replaced in some areas. There\u2019s a broken pane of glass that needs to be repaired. The bike rack isn\u2019t installed yet.\u201d<\/p>\n\n\n\n<p>He continued, \u201cWhen I looked this morning, there were 75 items still being tracked, and we\u2019re probably going to find some more\u201d encountered by occupants as they settle in.<\/p>\n\n\n\n<p>Another late-in-the-game routine, though, is all but done. So-called commissioning, the process of testing the building\u2019s utilities equipment, can be completed as soon as that back-ordered heater is installed. In fact, the firm providing the new building-management controls, Maine Controls, was scheduled to train Facility Services staff on Aug. 22.<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh.webp\" alt=\"A slight regrading and grass reseeding behind 96 Campus Avenue will be among the last steps in the building\u2019s conversion to student housing. (Doug Hubley\/Bates College)\" class=\"wp-image-164815\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh-942x628.jpg 942w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_4912_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><figcaption class=\"wp-element-caption\">A slight regrading and grass reseeding behind 96 Campus Avenue will be among the last steps in the building\u2019s conversion to student housing. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>Moving away from punch-lists and commissioning, the 96 Campus Avenue grounds still need touching up. St. Laurent &amp; Son, the local firm responsible for site work on the project, will patch the lawn where construction equipment gouged it around the building. Meanwhile, in a separate project, Gottlieb Landscape Design of Mount Vernon will spiff up the tree-shaded area near the dorm\u2019s outdoor deck.<\/p>\n\n\n\n<p>The conclusion of the 96 Campus Avenue project will also conclude, for now, the presence on campus of <a href=\"https:\/\/www.bates.edu\/news\/?s=Consigli&amp;referrer=https%3A%2F%2Fwww.bates.edu%2Fnews%2F2024%2F02%2F28%2Fcampus-construction-update-feb-28-2024%2F\">Consigli<\/a>, whose representatives have been at Bates overseeing major construction at least as far back as 2006 \u2014 and more or less continuously since 2018 and <a href=\"https:\/\/www.bates.edu\/news\/2019\/03\/07\/campus-construction-update-march-8-2019\/\">the start of the Bonney Science Center<\/a>.<\/p>\n\n\n\n<p>Finally, Lanoie pointed out that he and Chris Streifel, Bates\u2019 director of capital planning and construction (and for years our guide through a number of big projects) have been working on a \u201cDay 2 list\u201d \u2014 possible upgrades to 96 Campus Avenue that have emerged in the course of the renovation just ending.<\/p>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh.webp\" alt=\"The student lounge at 96 Campus Avenue. (Doug Hubley\/Bates College)\" class=\"wp-image-164802\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh-942x628.jpg 942w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_96Campus_1872_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><figcaption class=\"wp-element-caption\">The student lounge at 96 Campus Avenue. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>For example, an aging section of roof near the building\u2019s new entrance should be replaced, as should the door to the building\u2019s former main entrance. Putting a single metal door there in place of the current pair of glass doors would send a clear message that the main entrance is elsewhere (in fact, relocated to a former service area in an annex facing the main campus).<\/p>\n\n\n\n<p>\u201cWe\u2019ll see if we can afford to do those based on what our contingency (fund) looks like at the end of the job,&#8221; Lanoie said. &#8220;And then we&#8217;ll prioritize that list and we&#8217;ll try to focus on them, maybe during a holiday break, and see what we can get done.\u201d (Campus Construction Update\u2019s equivalent list at home is called the \u201c<s>2020<\/s> <s>2023<\/s> 2030 List.\u201d)<\/p>\n\n\n\n<p><strong>They left us with crumbs<\/strong>: By the time you read this (or at least skim it in search of wacky humor), a substantial portion of the Russell Street soccer field will be green. In the first phase of installing a new FieldTurf playing surface, workers for the turf manufacturer began rolling out long strips of the plastic grass-like product early in the week.<\/p>\n\n\n\n<div class=\"wp-block-bates-slideshow2-slideshow swiper-effect-slide is-style-default\"><div class=\"slideshow-toolbar\"><a href=\"#\" class=\"js-open-fullscreen fullscreen-button\" title=\"View full screen\"><\/a><\/div><div id=\"slideshow3727\" class=\"swiper swiper-main has-captions has-autoheight has-pagination-progressbar\"><div class=\"swiper-button-next\"><\/div><div class=\"swiper-button-prev\"><\/div><div class=\"swiper-pagination\"><\/div><div class=\"swiper-wrapper\"><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Laying down the new FieldTurf surface at Russell Street Field on Aug. 27, 2024. Most of the turf sections weigh 1,269 pounds and are 15 feet wide and 183 feet long. (Jay Burns\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164866\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_003_hjb.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_003_hjb-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_003_hjb-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Laying down the new FieldTurf surface at Russell Street Field on Aug. 27, 2024. Most of the turf sections weigh 1,269 pounds and are 15 feet wide and 183 feet long. (Jay Burns\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Workers are installing a new FieldTurf surface at Russell Street Field on Aug. 27, 2024. Note the gravel subgrade in the foreground and the freshly laid turf in back. (Jay Burns\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164871\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_004_hjb.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_004_hjb-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_004_hjb-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Workers are installing a new FieldTurf surface at Russell Street Field on Aug. 27, 2024. Note the gravel subgrade in the foreground and the freshly laid turf in back. (Jay Burns\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"The layers of FieldTurf are placed grassy side to grassy side to be stitched together. (Jay Burns\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164867\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_005_hjb.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_005_hjb-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_005_hjb-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>The layers of FieldTurf are placed grassy side to grassy side to be stitched together. (Jay Burns\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Artificial grass is woven into a heavy fabric matrix to form the basis of the new FieldTurf playing surface at Russell Street Field. Layers of sand and crumb-rubber infill will support the grass and impart desirable playing qualities to the field. (Jay Burns\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164870\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240828_russell_FieldTurf_9913_hjb.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240828_russell_FieldTurf_9913_hjb-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240828_russell_FieldTurf_9913_hjb-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Artificial grass is woven into a heavy fabric matrix to form the basis of the new FieldTurf playing surface at Russell Street Field. Sand and crumb-rubber infill will support the grass and impart desirable playing qualities to the field. (Jay Burns\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"Dan Gleason, FieldTurf site supervisor, uses a handheld sewing machine to stitch together sections of the new Russell Street Field playing surface. One worker precedes Gleason, blowing compressed air to clear debris. Others simply support the heavy turf using grippers like the one at left. (Jay Burns\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164868\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_018_hjb.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_018_hjb-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_018_hjb-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>Dan Gleason, FieldTurf site supervisor, uses a handheld sewing machine to stitch together sections of the new Russell Street Field playing surface. One worker precedes Gleason, blowing compressed air to clear debris. Others simply support the heavy turf using grippers like the one at left. (Jay Burns\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><div class=\"swiper-slide\"><img decoding=\"async\" alt=\"A close look at the crumb rubber infill that will be spread over the new FieldTurf playing surface. (Jay Burns\/Bates College)\" height=\"600\" width=\"900\" data-id=\"164869\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_021_hjb.webp\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_021_hjb-900x600.webp\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240827_Russell_FieldTurf_021_hjb-900x600.webp\" loading=\"lazy\"\/><div class=\"image_caption\"><p>A close look at the crumb-rubber and sand infill that will be spread over the new FieldTurf playing surface. (Jay Burns\/Bates College)<\/p><\/div><div class=\"swiper-lazy-preloader\"><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<p>As workers used specialized machinery to unspool the turf onto the subgrade, that process was heavy and mechanical. But as other workers adjusted the seams and sewed the strips together, it was also&nbsp;precise and hands-on. <\/p>\n\n\n\n<p>Each strip of turf is 15 feet wide, 183 feet long, and, not surprisingly, heavy \u2014 nearly 1,300 pounds. What was surprising is how fast a team of workers, half-a-dozen or so, could fasten the seam between two strips. For that process, the strips were arranged face to face \u2014 grassy side to grassy side.<\/p>\n\n\n\n<p>Several members of the team used tong-like grippers to raise the strips, align them, clamp them together for stitching, and set them down again. In the middle of the group, one worker blew debris out of the seam with a jet of compressed air and another, FieldTurf site supervisor Dan Gleason, used a handheld electric sewing machine to stitch the seam.<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh.webp\" alt=\"The pale gray expanse at center is the bare subgrade of the Russell Street soccer field. A new playing surface will be overlaid on it starting Aug. 26. (Doug Hubley\/Bates College)\" class=\"wp-image-164819\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh-942x628.jpg 942w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4925_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><figcaption class=\"wp-element-caption\">The pale gray expanse across the middle of the image is what the Russell Street soccer field looked like the week before installation of the new FieldTurf began. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>As he moved along, the strip wranglers on the loose side got out of his way and crossed behind him to handle the stitched area.<\/p>\n\n\n\n<p>By mid-afternoon Tuesday, Farnsworth noted, about three-quarters of the turf was in place. But it will take much longer, probably a couple of weeks, for the next phase of the job: working infill into the turf. That infill, reclaimed from prior turf surfaces elsewhere, comprises a mix of sand and rubber crumbs. After they use up the reclaimed material, \u201cthey will finish off the top of the field with new rubber pellets.\u201d<\/p>\n\n\n\n<p>The infill provides shock absorption, structural stability, and, by holding the grass blades upright, an aesthetic benefit.<\/p>\n\n\n\n<p>And the handwork will return later with the quasi-surgical activity of excising bits of turf so that sport-specific lines (such as the penalty area in soccer or goalie crease in lacrosse) and Bates-branding visuals can be stitched into the openings.<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh.webp\" alt=\"Workers lay down a wooden path that will protect the Russell Street track surface from machinery crossing the track to get onto the soccer field, where a new FieldTurf playing surface will be installed. (Doug Hubley\/Bates College)\" class=\"wp-image-164817\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh-942x628.jpg 942w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4915_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><figcaption class=\"wp-element-caption\">On Aug. 21, workers lay down a wooden path that will protect the Russell Street track surface from machinery crossing the track to get onto the soccer field, where a new FieldTurf playing surface will be installed. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>The infill has provided an additional aesthetic treat, too, but it\u2019s temporary. Rubber crumbs started arriving last week, creating a spectacle at the Russell Street parking lot: a reef of fabric bags seeming to stretch from horizon to horizon, all filled with rubber crumbs (putting us in mind of the Three Stooges\u2019 ditty, \u201cShe was bred in old Kentucky, but she\u2019s just a crumb up here\u201d).&nbsp;<\/p>\n\n\n\n<p>The crumbs are created by freezing and shattering worn-out (or you might say, retired) tires.<\/p>\n\n\n\n<p>The Russell Street Field revamp also includes new field lights, and the bases for those, made of precast concrete, are in place. A crane will visit the field Sept. 5\u20136 to erect the poles and place the lamp arrays, which should be fun to watch.<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh.webp\" alt=\"Sacks of rubber crumbs for the soon-to-be-installed artifiical turf at Russell Street Field are delivered to the Facility Services parking lot. (Doug Hubley\/Bates College)\" class=\"wp-image-164821\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh-942x628.jpg 942w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4931_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><figcaption class=\"wp-element-caption\">Sacks of sand mixed with rubber crumbs for the soon-to-be-installed artificial turf at Russell Street Field are delivered to the Facility Services parking lot on Aug. 21. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n\n\n\n<p>Paul Farnsworth, Bates project manager for the field makeover, explains that the lights are activated for games by a central computer system. That system is a proprietary service provided by the lighting manufacturer, MUSCO, of Oskaloosa, Iowa. (Bates is a longtime MUSCO customer.)<\/p>\n\n\n\n<p>Clients log in and indicate when the lights should shine, and the computer makes it happen wirelessly. The only wired connection is for the raw electricity feeding the lamps. (This makes more sense than what we had pictured: someone running around at game time to switch on each of the four field lights by pulling a very, very long chain.)<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"900\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh-600x900.webp\" alt=\"Shown is one of four concrete bases for new field lights that will be imnstalled at Russell Street Field in early September. (Doug Hubley\/Bates College)\" class=\"wp-image-164816\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh-600x900.webp 600w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh-200x300.webp 200w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh-419x628.jpg 419w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh-1024x1536.webp 1024w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh-133x200.webp 133w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4914_dlh.webp 1279w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Shown is one of four concrete bases for new field lights that will be installed at Russell Street Field in early September. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Finally, changes are coming to the Russell Street facilities for softball and for throwing events. New batting cages, one for visiting teams and one for the Bobcats, are being built.<\/p>\n\n\n\n<p>Also under construction are a throwing cage for discus and hammer, and a javelin runway. The latter, Farnsworth explains, is needed because the old one is too close to the soccer field \u2014 \u201cwe can&#8217;t throw javelins into our new turf.\u201d (The old runway will remain, but for use only with rubber-tipped javelins.)<\/p>\n\n\n\n<p>These features are going into a grassy patch between the softball outfield and St. Mary\u2019s Health System property. Bates\u2019 Ultimate teams and other sports have used that area in the past, and they\u2019ll have more options with the new Field Turf.\u00a0<\/p>\n\n\n\n<p><strong>Can we talk<\/strong>? Send your thoughts about past, present, future, and parallel-universe Bates construction projects to <a href=\"mailto:dhubley@bates.edu\">Doug Hubley<\/a>. Please put \u201cConstruction Update\u201d or \u201cWas Shemp ever funny at all?\u201d in the subject line.<\/p>\n\n\n\n<p><em>Doug Hubley is a writer and musician living in Portland, Maine.<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image alignfull size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1919\" height=\"1279\" src=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh.webp\" alt=\"A Shaw Brothers truck and the Bates softball scoreboard are shown at rakish angles. (Doug Hubley\/Bates College)\" class=\"wp-image-164820\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh.webp 1919w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh-400x267.webp 400w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh-900x600.webp 900w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh-942x628.jpg 942w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh-1536x1024.webp 1536w, https:\/\/www.bates.edu\/news\/files\/2024\/08\/240821_CCU_RussellStField_4929_dlh-200x133.webp 200w\" sizes=\"(max-width: 1919px) 100vw, 1919px\" \/><figcaption class=\"wp-element-caption\">A Shaw Brothers truck and the Bates softball scoreboard are shown at rakish angles. (Doug Hubley\/Bates College)<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Bates students have been sleeping and socializing since last week in the college\u2019s newest campus residence, following an eight-month renovation.<\/p>\n","protected":false},"author":105,"featured_media":164823,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_hide_ai_chatbot":false,"_ai_chatbot_style":"","associated_faculty":[],"_Page_Specific_Css":"","_bates_restrict_mod":false,"_table_of_contents_display":false,"_table_of_contents_location":"","_table_of_contents_disableSticky":false,"_is_featured":false,"footnotes":"","_bates_seo_meta_description":"","_bates_seo_block_robots":false,"_bates_seo_sharing_image_id":0,"_bates_seo_sharing_image_twitter_id":0,"_bates_seo_share_title":"","_bates_seo_canonical_overwrite":"","_bates_seo_twitter_template":""},"categories":[11012,11009],"tags":[12360,1932,12366],"class_list":["post-164822","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-student-life","category-the-college","tag-96-campus-avenue","tag-campus-construction-updates","tag-russell-street-field"],"_links":{"self":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/164822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/users\/105"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/comments?post=164822"}],"version-history":[{"count":27,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/164822\/revisions"}],"predecessor-version":[{"id":165273,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/164822\/revisions\/165273"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media\/164823"}],"wp:attachment":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media?parent=164822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/categories?post=164822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/tags?post=164822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}