{"id":35635,"date":"2010-09-17T17:18:57","date_gmt":"2010-09-17T21:18:57","guid":{"rendered":"http:\/\/home.bates.edu\/?p=35635"},"modified":"2018-09-28T12:53:01","modified_gmt":"2018-09-28T16:53:01","slug":"ccu10sep20-landing","status":"publish","type":"post","link":"https:\/\/www.bates.edu\/news\/2010\/09\/17\/ccu10sep20-landing\/","title":{"rendered":"Campus Construction Update: Sept. 20, 2010"},"content":{"rendered":"<div id=\"attachment_87597\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-87597\" class=\"wp-image-87597\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3.jpg\" alt=\"A worker wrangles a steel component for the Garcelon Field grandstand as it's unloaded on Sept. 15, 2010.\" width=\"590\" height=\"443\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3.jpg 590w, https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3-400x300.jpg 400w, https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3-144x107.jpg 144w, https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3-200x150.jpg 200w\" sizes=\"(max-width: 590px) 100vw, 590px\" \/><\/a><p id=\"caption-attachment-87597\" class=\"wp-caption-text\">A worker wrangles a steel component for the Garcelon Field grandstand as it&#8217;s unloaded on Sept. 15, 2010.<\/p><\/div>\n<p><strong>The grandstand is rising at Garcelon Field, the eagle landed at 10 Frye St., and they&#8217;re still<\/strong> <strong>slinging steel at Hedge and Roger Williams halls:<\/strong><\/p>\n<p>&#8220;That\u2019s going to be a fun thing to watch to go together,&#8221; Garcelon Field project manager Mike Gustin said as the first components of the new <strong>Garcelon Field grandstand<\/strong> showed up on Sept. 15. <a href=\"http:\/\/home.bates.edu\/views\/2010\/09\/20\/ccu10sep20-garcelon\/\">Read more about the renovation of Garcelon Field<\/a>.<\/p>\n<p>Watching workers fasten wooden planks to the sides of steel beams near <strong>Roger Williams Hall<\/strong> the other day, we got vague ideas about some kind of bare-brick, hanging-fern, exposed-beam motif for the interior renovation. Not so, said project manager Paul Farnsworth. <a href=\"http:\/\/home.bates.edu\/views\/2010\/09\/17\/ccu10sep20-hedge-bill\/\">Read more about the renovation of Roger Williams and Hedge halls<\/a>.<\/p>\n<p>On Sept. 9, a crew from Facility Services restored the 1873 eagle weathervane to its roost atop the carriage house at <strong>10 Frye St.<\/strong>, Bates&#8217; newest student residence. Carpenters Tim Chouinard and Tom Winslow went up in a 65-foot cherry picker to remount the bird, with painter Dan Sands, who gave the bald eagle its colors, standing by. <a href=\"http:\/\/home.bates.edu\/views\/2010\/09\/17\/ccu10sept20-frye\/\">See images of the eagle being returned to its aerie<\/a>.<\/p>\n<p><strong>Can we talk<\/strong>? Campus Construction Update welcomes your questions, reminiscences and comments about campus improvements. Please e-mail staff writer Doug Hubley at this <a href=\"mailto:dhubley@bates.edu\">E-mail<\/a>, stating &#8220;Construction Update&#8221; in the subject line.<\/p>\n<hr \/>\n<p><strong>View a slide show of the renovations of Garcelon Field and Hedge and Roger Williams halls by clicking the thumbnails below:<\/strong><\/p>\n\t\n\t<div class=\"wp-block-bates-slideshow2-slideshow swiper-effect-slide is-style-boxed-in\">\n\t\t<div class=\"slideshow-toolbar\">\n\t\t\t<a href=\"#\" class=\"js-open-fullscreen fullscreen-button\" title=\"View full screen\"><\/a>\n\t\t<\/div>\n\t\t<div id=\"slideshow6244\" class=\"swiper swiper-main has-captions has-autoheight has-pagination-progressbar\">\n\t\t\t<div class=\"swiper-button-next\"><\/div>\n\t\t\t<div class=\"swiper-button-prev\"><\/div>\n\t\t\t<div class=\"swiper-pagination\"><\/div>\n\t\t\t<div class=\"swiper-wrapper\">\t<div class=\"swiper-slide\">\n\t\t<img decoding=\"async\" alt=\"New Garcelon Field grandstand\" data-id=\"84525\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/6-100917_garcelonstands_0001web.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/6-100917_garcelonstands_0001web.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/6-100917_garcelonstands_0001web.jpg\" loading=\"lazy\"\/>\n\t\t<div class=\"image_caption\"><p>Building the new Garcelon Field grandstand on Sept. 17, 2010. Photo by Elizabeth McKean '12.<\/p><\/div>\n\t\t<div class=\"swiper-lazy-preloader\"><\/div>\n\t<\/div>\t<div class=\"swiper-slide\">\n\t\t<img decoding=\"async\" alt=\"Hedge Hall and Roger Williams halls\" data-id=\"84521\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/2-0041-9-15-10-hedge-side-view2.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/2-0041-9-15-10-hedge-side-view2.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/2-0041-9-15-10-hedge-side-view2.jpg\" loading=\"lazy\"\/>\n\t\t<div class=\"image_caption\"><p>Seen from the Historic Quad on Sept. 15, 2010, with about 11 months to go on their renovations, are Hedge Hall and behind it, Roger Williams Hall.<\/p><\/div>\n\t\t<div class=\"swiper-lazy-preloader\"><\/div>\n\t<\/div>\t<div class=\"swiper-slide\">\n\t\t<img decoding=\"async\" alt=\"New grandstand\" data-id=\"84522\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/3-0019-9-15-10-garcelon-worker3.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/3-0019-9-15-10-garcelon-worker3.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/3-0019-9-15-10-garcelon-worker3.jpg\" loading=\"lazy\"\/>\n\t\t<div class=\"image_caption\"><p>Concrete footers for the new Garcelon Field grandstand, shown on Sept. 15, 2010.<\/p><\/div>\n\t\t<div class=\"swiper-lazy-preloader\"><\/div>\n\t<\/div>\t<div class=\"swiper-slide\">\n\t\t<img decoding=\"async\" alt=\"Pieces of the new grandstand\" data-id=\"84523\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/4-0010-9-15-10-garcelon-construction-trucks.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/4-0010-9-15-10-garcelon-construction-trucks.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/4-0010-9-15-10-garcelon-construction-trucks.jpg\" loading=\"lazy\"\/>\n\t\t<div class=\"image_caption\"><p>Trucks arrive bearing steel pieces of the new Garcelon Field grandstand on Sept. 15, 2010.<\/p><\/div>\n\t\t<div class=\"swiper-lazy-preloader\"><\/div>\n\t<\/div>\t<div class=\"swiper-slide\">\n\t\t<img decoding=\"async\" alt=\"Steel for new grandstand\" data-id=\"84524\" data-fullsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/5-0005-9-15-10-garcelon-posts.jpg\" data-regsrc=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/5-0005-9-15-10-garcelon-posts.jpg\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/5-0005-9-15-10-garcelon-posts.jpg\" loading=\"lazy\"\/>\n\t\t<div class=\"image_caption\"><p>Steel components for the new Garcelon Field grandstand are unloaded on Sept. 15, 2010.<\/p><\/div>\n\t\t<div class=\"swiper-lazy-preloader\"><\/div>\n\t<\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The grandstand is rising at Garcelon Field, the eagle landed at 10 Frye St., and they&#8217;re still slinging steel at Hedge and Roger Williams halls.<\/p>\n","protected":false},"author":105,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_hide_ai_chatbot":false,"_ai_chatbot_style":"","associated_faculty":[],"_Page_Specific_Css":"","_bates_restrict_mod":false,"_table_of_contents_display":false,"_table_of_contents_location":"","_table_of_contents_disableSticky":false,"_is_featured":false,"footnotes":"","_bates_seo_meta_description":"","_bates_seo_block_robots":false,"_bates_seo_sharing_image_id":0,"_bates_seo_sharing_image_twitter_id":0,"_bates_seo_share_title":"","_bates_seo_canonical_overwrite":"","_bates_seo_twitter_template":""},"categories":[24,223,11009],"tags":[407,1932,10837,3083,3748,11074,10433,11033,9165],"class_list":["post-35635","post","type-post","status-publish","format-standard","hentry","category-athletics","category-slideshow","category-the-college","tag-10-frye-st","tag-campus-construction-updates","tag-chase-hall","tag-eagle","tag-garcelon-field","tag-residential-life","tag-slideshow-2","tag-student-contributors","tag-weathervane"],"_links":{"self":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/35635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/users\/105"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/comments?post=35635"}],"version-history":[{"count":11,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/35635\/revisions"}],"predecessor-version":[{"id":118893,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/35635\/revisions\/118893"}],"wp:attachment":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media?parent=35635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/categories?post=35635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/tags?post=35635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}