{"id":35668,"date":"2010-09-20T10:18:03","date_gmt":"2010-09-20T14:18:03","guid":{"rendered":"http:\/\/home.bates.edu\/?p=35668"},"modified":"2016-02-02T16:12:12","modified_gmt":"2016-02-02T21:12:12","slug":"ccu10sep20-garcelon","status":"publish","type":"post","link":"https:\/\/www.bates.edu\/news\/2010\/09\/20\/ccu10sep20-garcelon\/","title":{"rendered":"Campus Construction Update, Sept. 20, 2010: Garcelon Field"},"content":{"rendered":"<p><a href='https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"590\" height=\"443\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/0007-9-15-10-garcelon-posts3.jpg\" class=\"attachment-large alignright\" alt=\"A worker wrangles a steel component for the Garcelon Field grandstand as it&#039;s unloaded on Sept. 15, 2010.\" \/><\/a><\/p>\n<p>&#8220;That\u2019s going to be a fun thing to watch to go together,&#8221; Garcelon Field project manager Mike Gustin said as the first components of the new Garcelon Field grandstand showed up on Sept. 15.<\/p>\n<p><!--more--><\/p>\n<p>A pair of long flatbed tractor-trailers that took up a good stretch of Central Avenue brought the first pieces of the stands. They arrived as workers for R.A.D. Sports, general contractor for the <a href=\"http:\/\/home.bates.edu\/views\/2010\/05\/25\/garcelon-field-project\/\">renovation<\/a>, put the final touches on the foundation footers &#8212; concrete cylinders &#8212; that were poured during the last couple of weeks.<\/p>\n<p><a href='https:\/\/www.bates.edu\/news\/files\/2010\/09\/100917_garcelonstands_0004web.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"400\" height=\"300\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/100917_garcelonstands_0004web-400x300.jpg\" class=\"attachment-medium alignright\" alt=\"Garcelon Field grandstand\" \/><\/a><\/p>\n<p>Manufactured by Dant Clayton, grandstand specialists in Louisville, Ky., enough of the black steel skeleton was assembled by Sept. 17 to create a grandstandy impression. Coming next is the aluminum planking, as well as the seats for the center section of the bleachers.<\/p>\n<p>The last major part, expected to show up Sept. 22, is the press box. Subcontracted by Dant Clayton to Mobile Facility Engineering of Cassopolis, Mich., this 10-by-48-foot box will arrive ready to be hoisted into place, said Gustin.<\/p>\n<p>The whole grandstand is factory-painted. &#8220;It will be primarily black&#8221; and natural aluminum, with a garnet border around the top, &#8220;Bates&#8221; on the front (in a typeface created by Bates designers), and &#8220;Bates&#8221; and &#8220;Garcelon Field,&#8221; in the college&#8217;s customary Sabon typeface, facing Central Avenue.<\/p>\n<p>Gustin notes that the structure will continue to serve a function critical to the functioning of a college campus: serving as a lovers&#8217; hideaway that&#8217;s still within earshot of the game. There will be storage areas under the bleachers for athletic gear, but space will remain to accommodate that time-honored romantic imperative.<\/p>\n<p><a href='https:\/\/www.bates.edu\/news\/files\/2010\/09\/0025-9-15-10-garcelon-cement.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"400\" height=\"300\" src=\"https:\/\/www.bates.edu\/news\/files\/2010\/09\/0025-9-15-10-garcelon-cement-400x300.jpg\" class=\"attachment-medium alignright\" alt=\"Garcelon Field grandstand footers\" \/><\/a><\/p>\n<p>Away from the stands, and with the field dedication and first home game, coming up on Oct. 9 vs. Williams, progress on the football field&#8217;s renovation is in the final stages. Gustin expected T.W. Paving of Mechanic Falls to start pouring the walkway encircling the field any day now &#8212; noting that the company has a concurrent nighttime gig paving the Maine Turnpike.<\/p>\n<p>&#8220;Bill Bergevin did a nice landscaping job over underneath the new flagpoles,&#8221; Gustin added. &#8220;The old Garcelon Field stone that was under the old scoreboard has been reset in front of the center flag pole,&#8221; referring to the marker commemorating Bates&#8217; first football game &#8212; which actually took place at the field next to Rand Hall in 1875, against Tufts, and whose outcome we needn&#8217;t discuss here.<\/p>\n<p>With the end of the project in sight (and one more Campus Construction Update for the renovation in the cards), Gustin said that this project has &#8220;been a fun one to work on, because it\u2019s athletics and it&#8217;s so visible.&#8221;<\/p>\n<p>And it also brings him full circle. &#8220;About 26 years ago, I worked for the construction company that did the last renovation of the field,&#8221; Gustin said. That was H.E. Sargent Inc. of Stillwater, now known as Sargent Corp. And this week, &#8220;I just had my 25th anniversary at Bates.&#8221;<\/p>\n<p><a href=\"http:\/\/home.bates.edu\/views\/2010\/09\/17\/ccu10sep20-hedge-bill\/\">Read about the renovation of Hedge and Roger Williams halls<\/a>.<\/p>\n<p><a href=\"http:\/\/home.bates.edu\/views\/2010\/09\/17\/ccu10sept20-frye\/\">See images of the reinstallation of the eagle weathervane at 10 Frye St<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;That\u2019s going to be a fun thing to watch to go together,&#8221; Garcelon Field project manager Mike Gustin said as the first components of the new Garcelon Field grandstand showed up on Sept. 15.<\/p>\n","protected":false},"author":105,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_hide_ai_chatbot":false,"_ai_chatbot_style":"","associated_faculty":[],"_Page_Specific_Css":"","_bates_restrict_mod":false,"_table_of_contents_display":false,"_table_of_contents_location":"","_table_of_contents_disableSticky":false,"_is_featured":false,"footnotes":"","_bates_seo_meta_description":"","_bates_seo_block_robots":false,"_bates_seo_sharing_image_id":0,"_bates_seo_sharing_image_twitter_id":0,"_bates_seo_share_title":"","_bates_seo_canonical_overwrite":"","_bates_seo_twitter_template":""},"categories":[24,11009],"tags":[1932,3748],"class_list":["post-35668","post","type-post","status-publish","format-standard","hentry","category-athletics","category-the-college","tag-campus-construction-updates","tag-garcelon-field"],"_links":{"self":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/35668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/users\/105"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/comments?post=35668"}],"version-history":[{"count":4,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/35668\/revisions"}],"predecessor-version":[{"id":87602,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/35668\/revisions\/87602"}],"wp:attachment":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media?parent=35668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/categories?post=35668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/tags?post=35668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}