{"id":80,"date":"2007-02-07T00:00:00","date_gmt":"2007-02-07T05:00:00","guid":{"rendered":"http:\/\/hub-dev.bates.edu\/campus-improvements\/campus-construction-update-week-of-feb-5\/"},"modified":"2016-02-02T16:12:23","modified_gmt":"2016-02-02T21:12:23","slug":"campus-construction-update-week-of-feb-5","status":"publish","type":"post","link":"https:\/\/www.bates.edu\/news\/2007\/02\/07\/campus-construction-update-week-of-feb-5\/","title":{"rendered":"Campus construction update: Week of Feb. 5, 2007"},"content":{"rendered":"<div id=\"attachment_94320\" style=\"width: 610px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-94320\" class=\"wp-image-94320\" src=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402-900x675.jpg\" alt=\"Steel encloses the space where the new Commons kitchen will be. (Doug Hubley\/Bates College)\" width=\"600\" height=\"450\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402-900x675.jpg 900w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402-400x300.jpg 400w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402-144x107.jpg 144w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402-200x150.jpg 200w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/07-0205-KitchenFrame_Btr_7402.jpg 1440w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><p id=\"caption-attachment-94320\" class=\"wp-caption-text\">Steel rises for the kitchen area of the new Commons. (Doug Hubley\/Bates College)<\/p><\/div>\n<p>Construction of the <a href=\"https:\/\/www.bates.edu\/improvements\/completed-projects-2005-08\/new-student-housing-september-2007\/\">new student housing,<\/a> at College Street and Mountain Avenue, is making hot progress despite the continuing bitter cold.<\/p>\n<div id=\"attachment_94364\" style=\"width: 235px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-BlueSkin_7415.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-94364\" class=\"size-medium wp-image-94364\" src=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-BlueSkin_7415-225x300.jpg\" alt=\"Sandwich generation: &quot;Blueskin&quot; weather barrier forms a layer of the roofing &quot;sandwich&quot; on the new student housing. (Doug Hubley\/Bates College)\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-BlueSkin_7415-225x300.jpg 225w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-BlueSkin_7415-675x900.jpg 675w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-BlueSkin_7415-150x200.jpg 150w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-BlueSkin_7415.jpg 810w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><p id=\"caption-attachment-94364\" class=\"wp-caption-text\">Sandwich generation: &#8220;Blueskin&#8221; weather barrier forms a layer of the roofing &#8220;sandwich&#8221; on the new student housing. (Doug Hubley\/Bates College)<\/p><\/div>\n<p>With the goal of having the building weathertight by the end of February, the roofing of the three-section building&#8217;s two wings, aka &#8220;flankers,&#8221; is moving fast. Wooden framing in the dormers began last week and is well under way.<\/p>\n<p>The plywood decks now covering the flankers&#8217; main roof sections form the bottom layer of a sort of Dagwood sandwich designed for energy efficiency. Next comes Blueskin weather barrier, a self-sticking membrane already in vivid evidence on the west flanker; then insulation; another layer of plywood; and, finally, during the spring, a metal roof sheathing of the kind familiar to anyone who&#8217;s spent much time in western Maine.<\/p>\n<p>The sandwich construction will give the building &#8220;a much tighter insulated envelope,&#8221; explained project manager Pam Wichroski. &#8220;Instead of insulating in between all the parts of our roof structure, we are basically putting the layer of insulation above all of that, so it&#8217;s consistent.&#8221;<\/p>\n<p>Putting a roof on the center section will start when the walls are completed. Also taking shape in the center section is the steel framework for the one of the structure&#8217;s signature features, a<br \/>\nglass-walled fireplace lounge facing the existing Rand Hall. <a href=\"https:\/\/www.bates.edu\/map.xml\">(See a campus map.)<\/a><\/p>\n<div id=\"attachment_94362\" style=\"width: 410px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-94362\" class=\"size-medium wp-image-94362\" src=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419-400x300.jpg\" alt=\"The steel structure of the fireplace lounge at 280 College St. (Doug Hubley\/Bates College) \" width=\"400\" height=\"300\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419-400x300.jpg 400w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419-900x675.jpg 900w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419-144x107.jpg 144w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419-200x150.jpg 200w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/CCU-280-0702XX-280-Fireplace-Lounge_7419.jpg 1440w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/a><p id=\"caption-attachment-94362\" class=\"wp-caption-text\">The steel structure of the fireplace lounge at 280 College St. (Phyllis Graber Jensen\/Bates College)<\/p><\/div>\n<p><b>Dining Commons:<\/b> There&#8217;s steady progress but not much breaking news with the building of the new <a href=\"https:\/\/www.bates.edu\/improvements\/completed-projects-2005-08\/new-dining-commons-february-2008\/\">Commons,<\/a> reported project manager Paul Farnsworth. The structural steel is in place at the northeast corner, where the finished building will house an extended-hours &#8220;convenience store.&#8221; And steel&#8217;s rising at the southeast, where the kitchen and &#8220;servery,&#8221; an array of themed food-prep and serving stations, will be built.<\/p>\n<p>With the skeleton not even half complete, the building&#8217;s striking size and relationship to its surroundings are nevertheless becoming apparent. <a href=\"http:\/\/abacus.bates.edu\/pix\/Commons-exterior-pano070207.jpg\">(See a panoramic view.)<\/a><\/p>\n<p>But behind the scenes, Farnsworth noted, &#8220;one of the things we&#8217;re working on now is the actual move-in of Dining Services.&#8221; Since the beginning of the project, Bates has worked with the national food-service consultant Ricca Newmark Design to sort out the logistics of closing one dining facility and moving into a new one without leaving the campus&#8217; collective stomach flapping against its collective ribs.<\/p>\n<p>&#8220;We know roughly when the move will happen, but it&#8217;s like hiring a wedding planner \u2014 you need someone who puts together all the details,&#8221; Farnsworth said.<\/p>\n<div id=\"attachment_93770\" style=\"width: 235px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/Blue-Dormers_7423-W14.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-93770\" class=\"size-medium wp-image-93770\" src=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/Blue-Dormers_7423-W14-225x300.jpg\" alt=\"Wood framing appears in the new dorm's dormers. (Doug Hubley\/Bates College)\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.bates.edu\/news\/files\/2007\/02\/Blue-Dormers_7423-W14-225x300.jpg 225w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/Blue-Dormers_7423-W14-675x900.jpg 675w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/Blue-Dormers_7423-W14-150x200.jpg 150w, https:\/\/www.bates.edu\/news\/files\/2007\/02\/Blue-Dormers_7423-W14.jpg 810w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><p id=\"caption-attachment-93770\" class=\"wp-caption-text\">Wood framing appears in the new dorm&#8217;s dormers. (Doug Hubley\/Bates College)<\/p><\/div>\n<p>At the same time, Bates is working with contractor Consigli Construction Co. to coordinate schedules for the trades that will start work as the skeleton as completed. &#8220;The HVAC guys, electrical, plumbing, fire protection, they&#8217;re all sharing drawings amongst themselves to make sure we don\u2019t have any conflicts,&#8221; he said.<\/p>\n<p><strong>Talk to Us:<\/strong> What do you think about the campus improvements process? What would you like to know about it? What do you know that we don&#8217;t? We want to hear from you \u2014 please e-mail your questions and comments to <a href=\"mailto:dhubley@bates.edu\">Doug Hubley,<\/a> with &#8220;Construction Update&#8221; in the subject line.<\/p>\n<hr size=\"1\" \/>\n<p><em>For a bird&#8217;s-eye view of the locations for the new student housing and dining Commons, plug these coordinates into <a href=\"http:\/\/earth.google.com\/\">Google Earth<\/a> or <a href=\"http:\/\/maps.google.com\/maps\">Google Maps<\/a> (for the latter, click &#8220;Satellite&#8221; or &#8220;Hybrid&#8221;):<\/em><\/p>\n<p><em><strong>New Student Housing: 44 06 25.65 N, 70 12 23.67 W<\/strong><\/em><\/p>\n<p><em><strong>New Dining Commons: 44 06 19.83 N, 70 12 06.93 W<\/strong><\/em><\/p>\n<hr size=\"1\" \/>\n<p><strong>Our Back Pages:<\/strong> See an index of earlier Campus Construction Updates <a href=\"https:\/\/www.bates.edu\/campus-improvements.xml\">here.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction of the new student housing, at College Street and Mountain Avenue, is making hot progress despite the continuing bitter cold.<\/p>\n","protected":false},"author":105,"featured_media":94320,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_hide_ai_chatbot":false,"_ai_chatbot_style":"","associated_faculty":[],"_Page_Specific_Css":"","_bates_restrict_mod":false,"_table_of_contents_display":false,"_table_of_contents_location":"","_table_of_contents_disableSticky":false,"_is_featured":false,"footnotes":"","_bates_seo_meta_description":"","_bates_seo_block_robots":false,"_bates_seo_sharing_image_id":0,"_bates_seo_sharing_image_twitter_id":0,"_bates_seo_share_title":"","_bates_seo_canonical_overwrite":"","_bates_seo_twitter_template":""},"categories":[11012,11009],"tags":[1932,1939,8243],"class_list":["post-80","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-student-life","category-the-college","tag-campus-construction-updates","tag-campus-improvements","tag-student-housing"],"_links":{"self":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/80","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/users\/105"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/comments?post=80"}],"version-history":[{"count":16,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/80\/revisions"}],"predecessor-version":[{"id":94370,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/posts\/80\/revisions\/94370"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media\/94320"}],"wp:attachment":[{"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/media?parent=80"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/categories?post=80"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bates.edu\/news\/wp-json\/wp\/v2\/tags?post=80"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}